Construction leader directing a crew on a steel-frame site
The Weitz Company logo

Project Engineer · Industrial · Full Time

Project Engineer (Electrical) - Data Center Construction

The Weitz CompanyDes Moines, IA

  • Pay not posted

Join EPI Power as an electrical Project Engineer supporting data center construction in Des Moines, with broad coordination duties and a six-day workweek.

Type
Full Time
Sector
Industrial

What similar roles post

The Weitz Company didn’t post pay.

Project engineers in the Midwest

$85k–$105k

Middle half of 72 posted jobs, last 12 months

We’ll email you a link to confirm first. Unsubscribe anytime.

About the role

Job Summary

EPI Power, an electrical contractor focused on data center construction, is seeking a Project Engineer to support electrical work from preconstruction through closeout. The role connects engineering, VDC, procurement, prefabrication, and field teams and requires working six days per week, Monday through Saturday.

Project Details

Support fast-track electrical construction for data center and other mission-critical projects.

Responsibilities

  • Review electrical drawings, specifications, BIM models, and shop drawings; help resolve technical and coordination issues.
  • Prepare and track RFIs, submittals, material take-offs, schedules, as-builts, and other engineering documentation.
  • Coordinate with engineering, VDC, procurement, prefabrication, and field teams, and provide technical support to field staff.
  • Assist with material tracking, quality checks, installation verification, and project closeout.

Required Experience

  • Bachelor’s degree in Electrical Engineering, Construction Management, or a related field.
  • At least two years of project engineer or field engineer experience, preferably with an electrical contractor.
  • Ability to interpret electrical drawings, one-lines, panel schedules, and specifications.
  • Working knowledge of RFIs, submittals, and construction documentation; strong organization and communication skills.
  • Comfort with Microsoft Office, especially Excel.
  • Preferred: data center or mission-critical project experience; Autodesk Construction Cloud, Revizto, Navisworks, Revit, or Bluebeam; BIM/VDC coordination; prefabrication or DFMA exposure; and NEC knowledge.

Compensation and Benefits

The employer lists competitive pay and offers health benefits with HSA and FSA options, employer-paid disability and life insurance, paid time off, a 401(k) with company match, tuition reimbursement, paid parental leave, voluntary insurance products, and a wellness program.

Apply on the company's site — SiteLeadJobs links directly to the employer's posting.

Alert me about Project Engineer jobs in Iowa

We’ll email you a link to confirm first. Unsubscribe anytime.

Your application Two steps

  1. Send your application

    Apply at The Weitz Company (opens in a new tab)

    Apply link verified

    Opens The Weitz Company's careers site in a new tab.

  2. Track it in My jobs

    Saved jobs wait in My jobs, so you can follow up. Saving is free.

Similar leadership jobs

See all project engineer jobs
  • Project Engineer · Commercial

    Senior Preconstruction Project Engineer

    Ryan Companies US · Des Moines, IA

    Pay not posted

    ·

  • Project Engineer · Commercial

    Project Engineer

    Ryan Companies US · Cedar Rapids, IA

    Pay not posted

    ·

  • Project Engineer · Commercial

    Project Engineer

    Ryan Companies US · Des Moines, IA

    Pay not posted

    ·

Project Engineer (Electrical) - Data Center Construction

Apply now (opens in a new tab)